Update:Texas Group ERCOT Has Come To Rely on Conservation Alerts as a Normal Operating Procedure Rather Than an Exceptional Emergency Measure. The Problem Is Not the Weather but the System Design Itself, Which Has Insufficient Capacity to Match Load Growth

Texas Factories Dial Back Power Usage To Balance Strained Grid HNewsWire: Update, Some of the country’s most powerful political authorities neglected to allocate funds appropriately, resulting in the recent outages of the electric system. There are certain people who need to be held accountable, and I believe the next election will bring about significant alterations…

Read More